This is a story of a Restoration

I restored this boat from April 2006 to October 2008. You will need to go to the very bottom, October 2008, to find the biginning. See blog archive on the right side.















Tuesday, November 11, 2008

Continuing on....12 July 2007 #9 of 11

Another delicate thing I had to do, was to use a small laminate router (see all these tools I had to buy) to make the two horizontal edges of the two planks fit together tight. I couldn’t take a picture, because I couldn’t route and hold a camera at the same time. I will try to explain it.

The top edge of the last plank I just put on is made straight on the table saw and then I use a hand plane to make it perfectly straight before it is installed.. The next plank up is clamped to the hull with about a 1/4 inch gap between. Then a small laminate router is guided along the top of the bottom plank, and it cuts the bottom of the top plank exactly like the one below. So when the plank is lowered, it is a perfect fit. These technics all come from that wonderful book by Don Danenberg named "How To Restore Your Wooden Runabout."

The transom planks are next. Here is my jig for bending the planks. All three at the same time.



Look at that grain. It shows the book page affect.

The next step is the deck planking. The center darker plank is the king plank, and in the next ones out you can see the book-page grains. Even the rear deck had pieces of these same planks back there. Once again, a judge will look for that.




It is 1 Aug 2007. I took my wife to the hospital the next day, she was there for a week, and I didn’t resume work until mid October. I lost her on 17 Sep 2007. (Reread FunnyFarmers 17 Sepember post) She had been ill for several months before 7 Nov 2006, vote day, when she was diagnosed with congestive heart failure. I only tell you this, because my loss and my wondering mind caused a mistake when I returned to work.

8 Oct 2007

After everything settled down a bit, I went back to the shop. But it was too soon. My mind was elsewhere, and I made a big blunder that was hard to repair.

In the previous chapter, I had dry-fitted the deck planks. I took them off and preceded to rubber them in place. But when I put the king plank in place, I got the screw by the deck opening in the wrong hole, and it was off to the port side by about a quarter of an inch. I did not find this out until I glued the last outer most plank in place, and I would not have been able to remove the king plank. It had been too long. You can see that the inside curve did not line up with the ceiling board underneath. I am so thankful I did all of the port side first.

I then went home and didn’t return for two more weeks. My journal shows I went to visit my grand kids again and another short trip.

On the 25th of October, I made a thin tapered sliver of wood to fill the gap.
You may have noticed grooves in the deck planks. These are called a kerf. Later, these would be painted white for a striped look. I had to fill a kerf on the king plank, and have a kerf on the sliver. It was quit delicate, but I got it done.

After the deck was stained and varnished, I’ll challenge you to find the flaw.

Now both decks are finished and the covering planks are rubbered in to place.



The next step is cutting all the bung plugs to fill the screw holes. When a hole is drilled, it is counter sunk deep enough to put a wooden plug on top to hide the screw. Here is the process.
I have a special cutter that cuts a plug with the outside diameter a tiny bit larger than the inside diameter of the hole. It is tapered on the end for an easy start.
I then saw them out in a long line.



Then I dip the end plug in glue (not rubber), place it into the hole and tap it with a hammer. It breaks that one off the string of plugs and sets it into the hole.




You can see the little plugs sticking out, there is about 2500 on the sides and deck. I did not put plugs in the bottom.

Then I cut each one off just above the plank and sanded them smooth. After the wood is stained and varnished, they can hardly be seen.
The unique thing about this operation is, I saved the end of each plank, 4PF, etc. and labeled them and cut the bungs for that plank, put them in a sack for later and then put those bungs in that plank. This kept the colors matched pretty close. I spent 1 week cutting and inserting bungs.

The end of 2007 has come. I work/played for 515 hours during 39 weeks. When I first started the restoration process, I figured I would be through in July of 2007. When that came and went, then it was July 2008. It was taking more time than I thought. So my goal became, get it in the water so I can take pictures so I can enter it in boat shows during 2009. That means September/October 2008. Entries need to be in by May of 2009.
Tomorrow I will start the sanding and staining process.

Sunday, November 9, 2008

More loving work, 8 May 2007 #8 of 11

New rear deck support. Can you see the grooves in the wood in the lower center of the picture? This boat was starting to spread apart at the top. Years ago, someone put a heavy wire from one side to the other to hold it together. I reinforced these corners to eliminate the wires.


More paint in the bilge. Remove, rebuild and paint the steering gear and the horn. The steering gear is the same as a 1946 Studebaker pickup.

More new battens on the side of the hull.

Now we start on the topside planking. You can see the pattern plank and the new one trimmed and ready to go on. Trimming more to get it just right.




The one above is perfect.

The clamping methods I had to innovate for each set of planks.


There it is, all rubbered and screwed in place.

For each plank I had to trim and dry fit it before the glueing. Then I would install a plank on each side. See the long board with the weight? My boat was not true. The stem was not perfectly vertical. I placed a plumb line on the stem and when it was vertical, I glued the second pair of bottom planks in place. They held it true.


This method was used to force the plank down hard against the one below.

The hull now has three planks on each side.


Let me tell you about my planks. I had to order this African mahogany from a place in Michigan. I buy it in different widths 8 to 13 inches, and lengths 8 to 10 feet long. The boards are 1.5 inches thick. Before it is shipped, the supplier re-saws the board into two 3/4 inch thick pieces. You can see the pairs of planks below.


You can see them stacked in the picture above. These two 3/4 inch thick boards are now opened up like a book, and one is placed on the port side, the other on the starboard side. This is called book-page. Each board has it’s own grain and color. When you look at the front of the boat, you will see the same pattern on each side. If that were not done, when it comes time to show the boat, it will be down graded. This pattern will be easier to see after the boat is all varnished.

Before I put them on the boat, they are planned to ½ inch thick This wood is quit expensive. The 1.5 inch thick board costs $12 per square foot, plus the re-sawing which cost 60 cents per square foot. The mahogany and white oak for this boat cost $3600 plus $700 freight. And the sad part of it is, I loose half to planning and trimming to size. So an actual square foot on the boat costs about $25.

Four planks on.


I steamed this board in place. Sadly, it broke, and I lost a $100 board. I had to choose another set of planks, to keep my book-page effect.

Clamping the top planks into place was a real challenge.




All planks are in place. Hoorraahh. It is now 12 July 2007.


That last picture was number 500.

In the picture above, the plank looks straight. But because it is curved around the hull, it has to be shaped in a curve. The plank is about 5 inches wide, but I had to have a 13 inch wide board to start with. This photo is of a lower plank, you can see the curve.


This one is quit long, see you you tomorrow.

Friday, November 7, 2008

Assembly Again, 9 Feb. 2007, #7 of 11

Because the original keel was broken, the new keel had to be drilled for the propeller shaft and the rudder shaft.



This was a really stressful operation. I had to measure it perfectly so the prop shaft would line up with the engine flange. There is no universal joint. A straight line from the engine to the end of the shaft. And I wouldn’t find out if it was perfect or way off until September of 2008. That was when I installed the engine and lined every thing up.


A narrow strip of wood is cut to cover the chine and rubbered into place.


I then installed the first topside plank onto the topside frames.


Above, you can see the new batten being clamped into place. These are under each topside plank running longitudely with the seam. They support the planks between the frames, and provide the proper water proof sealing.


After the new bottomside planks are sanded and faired smooth, they are CEPS’ed, and the screw head holes are filled with FamWood putty. I have also painted some of the inside of the boat, it’s called the bilge, with the proper color of paint. I had to find wood that had not been exposed to the sun so I could match it. I needed this boat to be as original as possible.


You see here the pitot tube, the engine water pickup screen and the drain plug fittings installed.






The pitot tube is arranged forward facing, and the water is pressurized in the hole, and that makes the speedometer increase or decrease with the speed of the boat.

Reinforcing knees and gussets are placed in the corners of the boat.



The bottom of the hull is then painted with 5 coats of alternating colors of a special water barrier coat paint.

Here is the scary old boat guy. Should have had that for Halloween.

After the barrier coats are dry, each coat takes a day, I applied two coats of copper bronze bottom paint. The bottom part of the hull is now complete.





It is now 21 April 2007.

I have been a little over a year getting to this point. I have kept a log and diary of what I did each day and the time I worked on it. From the start on 15 April to 31 Dec 2006, I worked 475 hours. Now a lot of that time I was sitting in my chair and planning the next move. Envisioning in my mind how I would do the next step. Also there were trials and errors that had to be redone. And experiments tried that didn’t work. Such as, my first attempt at steaming was in boiling water. I cut the side out of an old hot water heater and it took way too much electricity and never did get to a boil. That took 2 days and a cel phone. You guessed it, I dropped it in the salt water.

The next thing that needed to be done was flip the boat right-side-up. This was done on cables and pulleys, hanging the boat from two chain hoists. Then I put the padding where it needed to be and got some help from my neighbor Randy. More promises. By the time I get this done, I will be all summer filling my obligations.




Work went on by installing the top transom bow.



Next I took off the rest of her clothing. The bottom planks would now hold her in shape.



Here is a photo of the inside of the hull, the bilge. You can see the new bottom side frames, the auxiliary frames, the plywood floor, and those long boards are the bilge stringers or keelson. The engine mounts are attached to these and they along with the keel, chines and shear hold this boat together.



The next chapter I will be installing the topside planks. I'm sure you are so excited and can hardly wait.